Gas Distribution System & Pipeline Construction

Preparation of 6 inch steel weld with the area secured with shoring, ladder and safety hook Welding of steel pipe inside trench box
Setting of riser and gas meter on residence Butt fusion of 5/8 inch service to saddle tee
Butt fusion of 6 inch PE Repair of 36 inch gas main in urban area
Plowing of 4 inch coiled pipe along highway Welding of 18 inch steel main by certified welder
Portable Padding machine used to pad 8 inch steel in rocky soil conditions Jeeping and lowering of 8 inch steel pipe into ditch through state forest
Preparing ends of 12 inch steel for welding  


COPYRIGHT 2004© ARBY CONSTRUCTION, INC.    |    ALL RIGHTS RESERVED